Jim/GA
Well-known member
Back at the pitman arm, the sequence of pieces to be installed are (from deep in the end out to the screw-in plug):
Cup
Ball
Cup
Spring
Screw-in plug
So the end of the drag link that has the hole for the ball to go in that is back away from the screw-in plug end goes to the pitman arm.
Up front at the spindle arm, the ball goes in after the spring and cup are inserted.
Sorry, no pictures. There is a drawing in the Service Bulletins showing the change in design from old to new.
Cup
Ball
Cup
Spring
Screw-in plug
So the end of the drag link that has the hole for the ball to go in that is back away from the screw-in plug end goes to the pitman arm.
Up front at the spindle arm, the ball goes in after the spring and cup are inserted.
Sorry, no pictures. There is a drawing in the Service Bulletins showing the change in design from old to new.