Update on Burtz Block Manufacturing May/June 2023.
I went to China a few weeks ago and thought I would provide a general update on the manufacturing situation there. China only opened up to foreign visitors just recently. This is the first time I have been back since November 2019. Those of you who do business in China and go there with some frequency to check on manufacturing etc., know this is really a long time to be away from the process. Overall, I was very pleased with the way the factories maintained communications over the Covid period and operations remained very smooth.
In my meeting with the cylinder block and head factory, I told them that hundreds of new engines are running and there have been no problems. I praised them on the quality of their QA and how their attention to detail was very good and that they have been doing a good job.
I asked them to make a few minor adjustments going forward.
1) On the bottom of the valve chamber cover machined surface, they will tap the center hole to 3/8-16 UNC to accommodate a set screw that can be used to retain the distributor drive gear housing, or the setscrew can be used to plug the hole. If you already have a block, this is a very simple job you can do yourself. We have explained it in the updated Builder’s Guide.
2) They will be making a UNC 1/2 – 13 button head hex drive rear oil-galley plug with a copper washer which will be added to the small parts kit with each block.
3) They will add an O-Ring groove to the #1 & 3 Main Cap studs for a 1.5 mm cross-section x 10 mm ID O-Ring that will prevent oil leaks from coming up through the castle nuts. We recommend the McMaster-Carr, Viton O-Ring 1295N162 for the studs.
The 3 changes above will be implemented in future production runs. The new grooved 1 & 3 studs and the oil-galley plug with washer will also be available fairly soon. We expect to have them in stock within about 45 days from now. If anyone is interested to receive any of these, please email me at: info@alliedclassic.com
Regarding the High Compression Head, they will increase the diameter of the water pump shaft thrust surface to 1 inch. This change will also be implemented in future production runs.
I visited other specialized factories making the crankshaft, connecting rods, camshaft and flywheel for the "New Engine" and again commended them on their QA and attention to detail.
The engineering and QA at all factories are good and we don't anticipate any future changes, but if there is a change, I will make an update describing the change.
I went to China a few weeks ago and thought I would provide a general update on the manufacturing situation there. China only opened up to foreign visitors just recently. This is the first time I have been back since November 2019. Those of you who do business in China and go there with some frequency to check on manufacturing etc., know this is really a long time to be away from the process. Overall, I was very pleased with the way the factories maintained communications over the Covid period and operations remained very smooth.
In my meeting with the cylinder block and head factory, I told them that hundreds of new engines are running and there have been no problems. I praised them on the quality of their QA and how their attention to detail was very good and that they have been doing a good job.
I asked them to make a few minor adjustments going forward.
1) On the bottom of the valve chamber cover machined surface, they will tap the center hole to 3/8-16 UNC to accommodate a set screw that can be used to retain the distributor drive gear housing, or the setscrew can be used to plug the hole. If you already have a block, this is a very simple job you can do yourself. We have explained it in the updated Builder’s Guide.
2) They will be making a UNC 1/2 – 13 button head hex drive rear oil-galley plug with a copper washer which will be added to the small parts kit with each block.
3) They will add an O-Ring groove to the #1 & 3 Main Cap studs for a 1.5 mm cross-section x 10 mm ID O-Ring that will prevent oil leaks from coming up through the castle nuts. We recommend the McMaster-Carr, Viton O-Ring 1295N162 for the studs.
The 3 changes above will be implemented in future production runs. The new grooved 1 & 3 studs and the oil-galley plug with washer will also be available fairly soon. We expect to have them in stock within about 45 days from now. If anyone is interested to receive any of these, please email me at: info@alliedclassic.com
Regarding the High Compression Head, they will increase the diameter of the water pump shaft thrust surface to 1 inch. This change will also be implemented in future production runs.
I visited other specialized factories making the crankshaft, connecting rods, camshaft and flywheel for the "New Engine" and again commended them on their QA and attention to detail.
The engineering and QA at all factories are good and we don't anticipate any future changes, but if there is a change, I will make an update describing the change.