flathead power

Lawrie

Well-known member
This is the first launch with the new roller cam and self machined heads,I have more work to do,fit a wheelie bar.
All the stuff we made worked good so far,no gasket leaks,data logger worked a treat,
We are now ready for the first full meeting this sat.we can,t wait.
As I said before ,this would have been a LOT harder without the help of JWL and Ol Ron and others.
The work to do before the meeting is fit a crank trigger sensor,make and fit a wheelie bar,and change the oil.Great.
Lawrie
5134549631_d55bcf6c94_z.jpg


5135149116_f872fbd139_z.jpg
 
Looking good, great pictures, thanks for sharing with those of us that wish we were there with you in person to share the smiles and hear the ponies hooking up.
Vergil
 
Back
Top