8EL
Senior Member
I have developed a jig to facilitate differential handling during the rebuilding process. It is still evolving, but the intent is to eliminate the handling issues associated with the awkwardness of a 4 plus foot long drive shaft hanging off the housing to set pinion pre-load, and allow quick setup utilizing the venerable shop vise. It is made from simple parts most of us have around the shop, and it re uses cups and cone bearings discarded from the rebuild process. The barrel is made from a piece of schedule 40 3.5" pipe, and the body is a piece of structural angle iron.The mandrel for setting pinion bearing pre-load is a section of the old drive shaft repurposed as well. More detail on this mandrel to follow, it was also used to set the carries up in the lathe to knurl the slightly undersized journal on one of the carrier halves to provide a tight pressed fit on the new carrier bearing.
My wife is soon to undergo surgery for breast cancer so there will probably be some delay in followup, but more to follow up on this process...
My wife is soon to undergo surgery for breast cancer so there will probably be some delay in followup, but more to follow up on this process...
Attachments
-
Jig_1.jpg69.2 KB · Views: 114 -
Jig_2.jpg59.1 KB · Views: 103 -
Jig_3.jpg36.4 KB · Views: 105 -
Jig_4.jpg64.4 KB · Views: 111 -
Jig_5.jpg81.3 KB · Views: 105 -
jig_6.jpg68.4 KB · Views: 100 -
Jig_7.jpg55 KB · Views: 104 -
Jig_8.jpg60 KB · Views: 100 -
Jig_9.jpg72.6 KB · Views: 112 -
Jig_10.jpg79.4 KB · Views: 106 -
Jig_11.jpg53 KB · Views: 116