Thomas T
Senior Member
Slow but sure. I now have the complete Frame Epoxy coated, the Floor bolted into place, the Roof is now permanently installed with Cherry Max Rivets and the Firewall is also riveted in place. The side panels, the back and then the corner trim hopeful will be completed within the next week or so. I have posted more photos on the web site; www.tomsoldbarn.com
Attachments
Last edited: