Yep. I have figured ^that^ out.
Thanks for all the replies!
Having installed a new harness (dash to engine) in my 51' Merc.(essentially the same as a 50' Ford), I wouldn't do it for less than $1,200. including the harness. That's assuming a shop rate of $80 per hour.
Now if you are looking for 1950 rates it might only cost a couple hundred.
I'm looking for today's $$, for.....
Out of curiosity, are you trying to find out how much to charge someone or how much you should be charged to do the job?
....yes, this is to figure how much to charge some one. Ultimately, I think the person is going to get a SMOKIN' deal, here's why.
He brought me a basically original '50 Custom 'vert. He had "the wiring harness" in it, very little actually worked, and he wanted me to install the new harness and make it pass a safety. BTW, it has what appears to be the optional(?) front and rear turn signals, fog lights, back up lights, etc.
I quickly realized that there are multiple harnesses, and what came with the car was the engine/dash harness. I pulled the original harness and installed the new one, and...nothing worked except what worked before. No surprise there....virtually every wire in the car was completely dry rotted and there where shorts to ground everywhere. Virtually every switch was 10-7 and most connections were corroded. To make the car "pass safety", I proceeded to diagnose the entire car, replace wires, replace connectors, rebuild switch gear and undo what "bubba" had done before me. By the time I was finish, I had build new harnesses for;
*Front parking lights
*Front turn signals
*Horns (only 1 wire there)
*Head lights
*Rear of car
*Gas tank/gauge
*Heater
*Fog lights
*New horn wire down the column and fixed horn button/switch
...I think that's about it.
I'm sure that I have well over 40 hours into it, but I don't want to charge the owner more than $1000.00
In addition to the wiring, I also built a new fuel delivery system, and rebuilt the master cylinder/bled brakes, and fixed some other miscellaneous stuff that was just "not right" and was bugging me.
It sounds (from the above posts) that if I charge $1k, I'm in no danger of over charging...Yes? No?
THANKS!