Well I had to go back to photos from about 20 years ago to show you these...
Back some 20+ years ago, we used a simple Eastwood Powder gun and good quality powder from Tiger-Drylac. It worked reasonably well, -and especially for what we had invested. That still holds true for today, that to have any type of efficiency you will need to spend thousands to purchase a quality gun. Likely that will be your deterrent too.
For us, we started simple and stayed with that and just outsourced bigger items such as Frames, Wheels, etc. Here is how we built our set-up. We made a small Coating Booth out of 2x4s and some Masonite where we hung parts and individually coated them. All this did was help contain the messy powder overspray. It is not needed in the grande scheme of things.
We also built an Oven using some 11 gauge sheetmetal, some 2"x2" Angle iron, and a cannibalized Oven I found on the side of the road. The insulation on the exterior was just basic commercial roofing insulation. The type that is used on commercial building that have flat roofs that the rubber membrane and tar is poured over top of. We place the insulation over the sheetmetal and then drilled 1/8th inch holes thru the insulation and the sheetmetal. We inserted a nail with a large washer to keep head of the nail from pulling thru the insulation as it was held tightly to the metal. On the inside, we just welded the nails to the sheetmetal and then cut the rest of the nail that was protruding. The Door seal was the graphite coated rope-looking seals commonly used in a Fireplace Insert to seal them to the Fireplace bricks. The switchbox housed all of the switches used to control the electric burner eyes and elements. There was an element located in the bottom (-as seen, and one in the very top under the roof). We had forgotten a few times and left the eyes & elements on and it would easily reach over 600°, but we generally regulated it between 350-400 degrees. We would preheat the parts to around 200° and then coat the parts. The ledges inside the oven held ½ EMP Conduit and the parts were suspended from that. You can likely see the Oven Thermometer suspended inside. Generally speaking, about 20 minutes at 350° was enough. Sometimes we would do a partial bake at 400° for 8-10 minutes and then sand the powder with 80 grit to fill pits prior to re-coating.
The bottom line for us was the overall quality and longevity was not there, -even when using the most expensive powders, and so we went back to using single-stage urethane instead of powder. The only benefit I can see by using powder-paint over sprayed catalyzed urethane is the powder-painted process does not have the Isocyanates to deal with. Best wishes if you decide to give it a try.
View attachment 652420View attachment 652421View attachment 652422View attachment 652423View attachment 652424View attachment 652425View attachment 652426View attachment 652427View attachment 652428