alexiskai
Well-known member
One thing I found helpful was to keep a list on my phone of all the projects or repairs that I wanted to do, and then I moved items around on the list to group and prioritize them. This helped me think through all the changes I wanted to make related to a particular assembly so that I could do my research, buy parts, keep my budget under control, etc. It also forced me to think through which projects were really the most important and which were, e.g., mostly cosmetic.
Also if a post comes up on Fordbarn that relates to a future project, I'll copy the number of the post (e.g., "#20") and paste it into the list because it works as a link to that post that I can trace back when I'm ready to tackle that project.
Also if a post comes up on Fordbarn that relates to a future project, I'll copy the number of the post (e.g., "#20") and paste it into the list because it works as a link to that post that I can trace back when I'm ready to tackle that project.