Tom Wesenberg
Well-known member
With a true, but misleading statement like that I should be head writer for the "New York Times"
LOL
Actually it was an empty peanut butter jar that I made into a water level and used to level my new Model A garage. I used a small pencil soldering iron to burn 2 holes in the plastic jar. I made them small enough to be a very tight fit for the plastic tubing. I pushed a 20 foot piece of clear tubing into each hole, then set the jar on a box in the center of the floor and about the same height as the top of the 2 x 12, which I was using as a base plate for the Menards shelter. I actually only used one hose and carried it to each spot I checked. I made a mark on the hose at the water level, and another mark at the top of the base plate, right in the middle of the 20 foot plate. I then went to the other side and adjusted the base plate to match up with the marks. This way I knew each side was at the exact same height. I then carried the hose 6' east of center and made another mark showing the board was 1 inch higher, and did the same on the other side. I then carried the hose 6' west and made another mark showing the board was 1 " lower, so I knew I had a 1" drop for each 6 feet going west. The shelter has the ribs running lengthwise, so I need some slope for the water to run off the end of the building.
For anyone that has never used a water level, they are very quick and easy to use and a very handy tool to have. Once you place the jar and fill it with water, you can't change it until everything is measured, or you'll have to recalibrate the markings.
I'll take down the plastic garage I've been using for the past 3 or 4 years, as soon as I get everything out of it.
I covered all the tin with insulating aluminum foil about 1/4" thick so I won't have to deal with drops of water from condensation. I made this tire and wheel rack today, and as soon as I took this picture I had it filled. The 4 horizontal and 4 vertical boards are each 4 feet long. The two bottom 2 x 6's are 28" long, so I used four 8 foot 2 x 4's and one 8 foot 2 x 6, and had some left over.
I covered the entire floor and up a foot on the side with 6 mil clear plastic, then covered that with some free carpet. My Model A never had it so good!
Actually it was an empty peanut butter jar that I made into a water level and used to level my new Model A garage. I used a small pencil soldering iron to burn 2 holes in the plastic jar. I made them small enough to be a very tight fit for the plastic tubing. I pushed a 20 foot piece of clear tubing into each hole, then set the jar on a box in the center of the floor and about the same height as the top of the 2 x 12, which I was using as a base plate for the Menards shelter. I actually only used one hose and carried it to each spot I checked. I made a mark on the hose at the water level, and another mark at the top of the base plate, right in the middle of the 20 foot plate. I then went to the other side and adjusted the base plate to match up with the marks. This way I knew each side was at the exact same height. I then carried the hose 6' east of center and made another mark showing the board was 1 inch higher, and did the same on the other side. I then carried the hose 6' west and made another mark showing the board was 1 " lower, so I knew I had a 1" drop for each 6 feet going west. The shelter has the ribs running lengthwise, so I need some slope for the water to run off the end of the building.
For anyone that has never used a water level, they are very quick and easy to use and a very handy tool to have. Once you place the jar and fill it with water, you can't change it until everything is measured, or you'll have to recalibrate the markings.
I'll take down the plastic garage I've been using for the past 3 or 4 years, as soon as I get everything out of it.
I covered all the tin with insulating aluminum foil about 1/4" thick so I won't have to deal with drops of water from condensation. I made this tire and wheel rack today, and as soon as I took this picture I had it filled. The 4 horizontal and 4 vertical boards are each 4 feet long. The two bottom 2 x 6's are 28" long, so I used four 8 foot 2 x 4's and one 8 foot 2 x 6, and had some left over.
I covered the entire floor and up a foot on the side with 6 mil clear plastic, then covered that with some free carpet. My Model A never had it so good!