glennpm
Well-known member
Gary, your vacu-press, in its horizontal flat surface configuration would be the simplest use I can think of, and as for an explanation, the vacuum pump provides the equivalent of 28” of mercury of vertical pull, but don’t ask me how many pounds per square inch that equals. In my experience, that’s just the beginning of force applied, as the project, still under continuous vacuum, would then go into an autoclave or a hydroclave, the latter producing pressure and heat of over 1000psi and 350* F. My products were exit cones for everything from Minute Man to Atlas missiles and everything in between including Reagan’s Star Wars toys. My operation was near the beginning of those products of reinforced carbon, what followed was a month long proprietary process that made them hard as diamonds and could ring like a bell.
About hydroclaves… my company had one blow its top once. It took the roof off the factory and they found the 4 ton lid buried in a far corner of the asphalt parking lot. A human mistake made 6 widows that night.
Very interesting about the cones. 28" Hg = 13.75psi
I worked on many electric generating power plants. On one mid-West plant a materials engineer and I designed, specified and contracted rubber lined 6" and 8" rubber lined piping. The power plant had boiler discharge gases go through a scrubber which uses a limestone slurry. The limestone slurry is very abrasive and therefore the need for rubber lining to protect the carbon steel piping. The piping we designed was routed about 7 miles from the plant to a wallboard manufacturer that used the waste slurry to produce the wallboard.
The special designed and hard durometer rubber pipe lining in these "small" diameters was done by making a long balloon then folded, dragged through 40' of length after the pipe inside wall was blasted and adhesive coated. The ends of the liner were turned over end flanges and then put in an autoclave where under internal pressure and heat; cured to the pipe inside diameter. Large diameter, human accessible, is lined with overlapping sheets of chlorobutyl rubber lining.
About a year later we got a call from the utility to investigate rubber lining failure in ~36" diameter piping supplying the slurry to the scrubbers. This piping was from a different company. I had to crawl in and around a couple of bends to do an inspection. I had a headset, harness and rope back to the opening. Good thing I'm not claustrophobic
Last edited: