I'm wrapping my 8ba build with an L100 cam, while I had the block bare, pre-hot tanking, I ground around 1/8" off the top of the lifter bores as well as drilled them as low as I could at 5/32 dia. as per Ol Rons book, did all the exhaust and intake port work needed, then took it to the machine...